INDUSTRIAL

INDEPENDENT TREATMENT CENTRES FOR NHS

Independent Treatment Centres for NHS

Our clients had been awarded a contract to construct new independent treatment centres over three separate sites which would carryout medical procedures for the NHS built utilising a modular construction system.  We were engaged to carry out the design and formation of the buildings’ foundations, drainage, services, car parks and external works prior to the modular units arrival on site.

With only the Planning Permission drawings, ground reports and foundation loading details we commenced our part of this project by designing the necessary elements to enable the buildings to be successfully installed.   Foundations were developed and engineered to suit the ground conditions of each site and drainage systems devised and installed as necessary to meet each building’s individual needs, as were car parking facilities and external works. Throughout the project we worked with extremely tight timescales whilst ensuring each site was accurately completed and ultimately ready to receive the modular buildings on time thus enabling our clients to fulfil their own commitments.

 

Independent Treatment Centres for NHS

Our clients had been awarded a contract to construct new independent treatment centres over three separate sites which would carryout medical procedures for the NHS built utilising a modular construction system.  We were engaged to carry out the design and formation of the buildings’ foundations, drainage, services, car parks and external works prior to the modular units arrival on site.

With only the Planning Permission drawings, ground reports and foundation loading details we commenced our part of this project by designing the necessary elements to enable the buildings to be successfully installed.   Foundations were developed and engineered to suit the ground conditions of each site and drainage systems devised and installed as necessary to meet each building’s individual needs, as were car parking facilities and external works. Throughout the project we worked with extremely tight timescales whilst ensuring each site was accurately completed and ultimately ready to receive the modular buildings on time thus enabling our clients to fulfil their own commitments.