Industrial > New Independent Treatment Centres

Project Report

Picture
NEW INDEPENDENT TREATMENT CENTRES

Architect: W S Atkins
Client:
UKSH
Main Contractor: Ken Biggs Contractors Ltd
Picture
Requirements 

UKSH, a healthcare provider for the NHS, had won a contract to provide Independent Treatment Centres to carry out medical procedures to cut NHS waiting lists. 

In turn Yorkon Ltd won contracts to build centres for them using modular construction to maximise speed of completion enabling the opening of the centres as soon as possible.

Our brief was to carry out the design and construction of the building’s foundations, drainage, services, associated car parks and external works for sites at Shepton Mallet, Emersons Green in Bristol and Devizes.

Construction

Using only the Planning Permission drawings, ground reports and foundation loading details provided by Yorkon Ltd we had to fully design foundations, drainage details, car parks and roads before works could commence on site.

The foundations were designed and constructed using mass concrete padded strip foundations which were engineered to suit the specific ground conditions of each site. Drainage systems were devised and installed throughout each site using plastic pipes laid as necessary to meet the requirements of the new buildings. Car parks and roads were formed using macadam surfaces with standard concrete kerbs. The depths of the capping layers to the car park and roads were designed again to suit the specific conditions of each site. 

Throughout this project we were working with extremely tight timescales to complete foundations and all substructure works prior to the delivery of the modular buildings.
Picture
All contracts were completed on time and to the satisfaction of our client.

Contract values:
Shepton Mallet £1.2 million
Emersons Green Bristol £1.5 million
Devizes £900,000


< previous project
next project >

Drag & drop footer content here

Ken Biggs Contractors Ltd
High Street
High Littleton
Bristol
BS39 6HP


©2015-2017 Ken Biggs Contractors Ltd. All rights reserved.

Tel: 01761 470743
Fax: 01761 471428
email: info@ken-biggs.co.uk




website by Creativeminds


Powered by Create your own unique website with customizable templates.