Roofing works then began, using indigenous slates and leadwork. Natural stone copings and detail banding were installed incorporating an oak framed Pentice link to the East Cloister range.
Internal works incorporated the installation of oak flooring and wall panelling, oak cupboards, doors and skirting with natural stone flooring fitted to the link and passage.
An energy efficient under floor heating system was installed along with hot and cold water and full electrical installations were carried out.
In the choir practice room an acoustically sympathetic ceiling was constructed along with wall linings to add an element of soundproofing to this space.
Decorations and final finishes were then installed to complete this project to a high standard and to the requirements of our client.